Wednesday, November 5, 2008
Final Subnission
The Ground level includes, in the main building, the foyer
which leads into the main gym hall with adjacent toilets and
change rooms and gym storage and kitchen. The cafe with
kitchen and then long corridor which leads to the two multi
purpose rooms and door leading to the playground.
The ground level also features the workshop and garage in one
building situated near the park, while the administration building
is situated near the grandstand.
Level one incorporates the second gym with change rooms
and toilets. Also the third multi purpose room, a general
storage area and audio tech room.
Wall section going through main and upper gym wall.
Perspective of the upper level gym hall.
Perspective of corridor leading from the gym to cafe area.
These two images helped in the site analysis, depicting
the fluid nature of the landscape and the overlapping and
in a sense the juxtaposition of the street scape.
This mapping image illustrates the abstraction of elements
from the site, and then using them in a conceptual way to
help in developing design ideas.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment